10 kV Substation (LER)

Status: Completed

Scope of Work

Provision of Construction Engineering and Construction Services for Buildings 10 kV Substation (LER)

Project Description

​​Scope of Work included the following activities:

1. Engineering
  • Structure & Architectural shop drawings
  • Secondary supports shop drawings
  • Yard methods engineering - Lifting procedures, etc.
  • Field engineering and site query management
  • Modifications management and control
  • Red-line marked up and as-built drawings
2. Procurement
  • Steel structures (primary, secondary, tertiary);
  • Architectural materials (insulation, lining, etc.);
  • Paint materials;
  • HVAC equipment – Free issued items;
  • HVAC ducts – Free issued items;
  • Bulk EIT items – Free issued items;
3. Fabrication
  • ​Prefabrication & Erection of Steel structure;
  • NDT;
  • Sandblasting & Painting;
  • Architectural (insulation, lining, etc.);
4. Electrical and Instrumental works
  • ​HVAC system;
  • Fire & Gas system;
  • Electrical system;
5. Mechanical completion

6. Assistance during Pre-Commissioning, Commissioning and Load-out​

Technical Details

​Dimensions – L: 19000 mm / W: 5000 mm / H: 4000 mm